Quick Answer: A High Court should not, in writ jurisdiction under Articles 226 and 227, set aside an arbitrator's order rejecting an objection of insufficient stamping by itself interpreting the contract while the arbitration is pending. The Supreme Court upheld the Orissa High Court Division Bench, which had set aside a Single Judge's order directing impounding of iron ore sale agreements. The stamping issue is left open for a challenge under Section 34 after the award.
In M/s Tarini Prasad Mohanty v. M/s Sunflag Iron and Steel Company Limited (2026 INSC 566), the Supreme Court held that a writ appeal lay against a Single Judge's decision on a writ petition filed under both Articles 226 and 227 of the Constitution, and that the Single Judge was not justified in setting aside the Arbitrator's order under Section 16 of the Arbitration and Conciliation Act, 1996 by entering into the merits and interpreting the agreements (paras 14, 23–24, 26). A Bench of Justice J.K. Maheshwari and Justice Atul S. Chandurkar held that, after the Constitution Bench decision in Re: Interplay, objections on stamping fall within the ambit of the Arbitral Tribunal, non-stamping is a curable defect, and the remedy under Section 16(6) read with Section 34 is adequate (paras 20–21, 23, 25).
Status: Orissa High Court Division Bench judgment in the writ appeal, which set aside the Single Judge's judgment dated 25.02.2025, upheld; issue of stamping kept open for Section 34; Civil Appeal dismissed with no order as to costs (paras 8–9, 26–27).
Headnote: Writ Challenge to Section 16 Ruling on Stamp Duty
Arbitration and Conciliation Act, 1996 – Sections 5, 16, 16(6), 34 and 37 – Indian Stamp Act, 1899 – Sections 2(10) and 35 – Schedule I, Articles 5(c) and 23 – Constitution of India – Articles 226 and 227 – Arbitrator's order rejecting objection of insufficient stamping – Agreement to sell versus conveyance – Letters Patent appeal – Maintainability and entertainability of writ petition – Interpretation of contract in writ jurisdiction – Minimal judicial intervention – Competence-competence.
Held: (i) Where a writ petition invokes both Articles 226 and 227 and the Single Judge grants relief without specifying any particular Article, the jurisdiction exercised cannot be treated as one under Article 227 alone; the writ appeal was maintainable, and the party who invoked both Articles and succeeded cannot now question it (paras 13–14).
(ii) Under the scheme of the A and C Act, a party aggrieved by the rejection of a Section 16 objection must await the award and raise the challenge under Section 34; Sections 16(5) and 16(6) oust interference by courts during the arbitral proceedings (paras 18–20).
(iii) After Re: Interplay, non-stamping or inadequate stamping is a curable defect affecting admissibility, not validity; the Arbitral Tribunal deals with it in the first instance, and the remedy under Section 34 at a later stage is not inadequate (para 21).
(iv) Where the statute provides a remedy and expects minimal judicial interference (Section 5), the threshold for exercising discretion under Articles 226 and 227 is higher; this goes to the entertainability, not the maintainability, of the writ petition (para 22).
(v) The Arbitrator had jurisdiction to decide the stamping objection; jurisdiction to decide does not mean jurisdiction to decide in a particular manner, and even an erroneous view that the agreement was an agreement to sell would not make the case exceptional (para 23).
(vi) A writ court should not interpret the agreements or enter into the merits while the arbitration is pending and evidence is yet to be led; whether the agreements amount to conveyance is left open for Section 34 (paras 24–25, 27).
(paras 13–27)
Case Details: Tarini Prasad Mohanty v. Sunflag Iron and Steel (2026 INSC 566)
Final Outcome: Civil Appeal dismissed; Division Bench's judgment upheld; Single Judge held not justified in exercising writ jurisdiction against the Section 16 order; stamping issue kept open for Section 34; no order as to costs.
Case: M/s Tarini Prasad Mohanty v. M/s Sunflag Iron and Steel Company Limited
Neutral Citation: 2026 INSC 566
Case No.: Civil Appeal No. ___ of 2026 (arising out of SLP (C) No. 27534 of 2025)
Court: Supreme Court of India (Civil Appellate Jurisdiction) – Reportable
Date of Decision: 27 May 2026
Bench: Justice J.K. Maheshwari and Justice Atul S. Chandurkar (author)
Relevant Acts & Sections: Arbitration and Conciliation Act, 1996 – Sections 5, 16, 34 and 37; Indian Stamp Act, 1899 – Sections 2(10) and 35, Schedule I, Articles 5(c) and 23; Sale of Goods Act, 1930 – Section 4(4); Constitution of India – Articles 226 and 227; Letters Patent – Clause 10
Impugned Order: Judgment of the Division Bench of the High Court of Orissa in the writ appeal preferred by the respondent, setting aside the Single Judge's judgment dated 25.02.2025 in the appellant's writ petition (paras 8–9)
Counsel: Mr. Shashank Garg, Senior Advocate, for the appellant; Mr. Gopal Subramanium, Mr. N.K. Mody and Ms. Malvika Trivedi, Senior Advocates, for the respondent (paras 10–11)
Source: Supreme Court of India (official website)
Key Holdings of the Supreme Court
- A writ petition filed under Articles 226 and 227, decided without specifying the Article, cannot be treated as one under Article 227 alone; the Letters Patent writ appeal was maintainable (paras 13–14).
- The mine owner had not questioned the maintainability of the writ appeal before the Division Bench; the contest there was on the scope of writ jurisdiction (para 15).
- Rejection of a Section 16 objection must ordinarily await the award and be challenged under Section 34 (paras 18–20).
- Non-stamping or inadequate stamping is a curable defect, and the Arbitral Tribunal is empowered to deal with it first; the Section 34 remedy is not inadequate (para 21).
- Given Sections 5 and 34, a higher threshold applies before a High Court entertains a writ petition at an interim stage of arbitration (para 22).
- An error on merits by the Arbitrator in deciding the stamping objection is not an inherent lack of jurisdiction (para 23).
- Interpretation of contracts should not generally be undertaken in writ jurisdiction, especially while the parties are yet to lead evidence (para 24).
Brief Facts of the Case
An agreement for sale of iron ore was executed on 12.02.2004 between the appellant (the mine owner) and the respondent (SISCO), followed by supplementary agreements. Disputes were referred to a Sole Arbitrator; SISCO made claims and the mine owner filed a counter claim (para 4).
On 05.02.2024 the mine owner filed an application under Section 16 contending that the agreements were in the nature of conveyance and had to be stamped under Article 23 of Schedule I to the Stamp Act, and that unless impounded and properly stamped the arbitration could not continue. SISCO replied that the agreements were duly stamped and that the objection was belated (paras 4–5).
By order dated 30.05.2024 the Arbitrator held that the agreement was an agreement to sell and not a conveyance or sale, and that it was properly stamped under Article 5(c) of Schedule I; the objection was rejected (para 5).
The mine owner filed a writ petition under Articles 226 and 227 before the High Court of Orissa. By judgment dated 25.02.2025 the Single Judge found an exceptional case, held that the Arbitrator lacked jurisdiction unless proper stamp duty was paid, set aside the Section 16 order and directed the agreements to be impounded and stamped under Article 23 of Schedule I (paras 6, 8).
On SISCO's writ appeal, the Division Bench held that the order upholding the Arbitrator's jurisdiction could be challenged under Section 34, that deciding the stamping issue required interpretation of the contract on evidence, and that the Arbitrator's view was neither perverse nor lacking in inherent jurisdiction; it set aside the Single Judge's judgment. The mine owner appealed (para 9).
Issues Before the Supreme Court
- Whether the writ appeal was maintainable, given the mine owner's plea that the Single Judge exercised jurisdiction only under Article 227 (para 12).
- Whether a challenge under Articles 226 and 227 to an order passed under Section 16 ought to have been entertained while the Arbitrator was seized of the proceedings (para 3).
- Whether the Division Bench was right in setting aside the Single Judge's order upholding the challenge (para 3).
Court's Findings and Reasoning
Appellant's case (para 10): Senior Counsel argued that the writ petition was in substance under Article 227, so no writ appeal lay; that an exceptional case of perversity was made out; that the agreements, read as a whole, amounted to conveyance; that failure to impound them was a jurisdictional error; and that the interest of the revenue and the limited scope of Section 34 justified interference.
Respondent's case (para 11): Senior Counsel argued that substantive writ reliefs had been sought, so the writ appeal was maintainable; that after Re: Interplay the stamping issue lay within the Arbitral Tribunal's jurisdiction and any error could be raised under Section 34 as provided by Section 16(6); and that the agreements envisaged a future sale of goods that were neither ascertained nor in a deliverable state.
Writ appeal maintainable (paras 12–15): The writ petition, its prayers and pleadings invoked Article 226, and the Single Judge did not confine himself to Article 227. Applying Lokmat Newspapers, Umaji Keshao Meshram and Jogendrasinhji Vijaysinghji, the Court held that SISCO's writ appeal was maintainable, and noted that the mine owner had not questioned maintainability before the Division Bench.
Scheme of Section 16 (paras 16–20): Referring to S.B.P. and Company, Deep Industries, Bhaven Construction and Re: Interplay, the Court noted that a party aggrieved by the rejection of a jurisdictional objection must wait for the award and challenge it under Section 34, and that objections on stamping fall within the ambit of the Arbitral Tribunal.
Stamping a curable defect (para 21): The plea that relegating the stamping objection to Section 34 would force the mine owner through costly proceedings rested on treating non-stamping as a fatal, jurisdictional infirmity. That premise no longer holds after Re: Interplay, which held that non-stamping affects admissibility and is curable.
Higher threshold for writ interference (para 22): Where a statute provides a remedy and expects minimal judicial interference, it must be shown that the challenge cannot await final adjudication and that intervention at an interim stage is imperative. Relying on Godrej Sara Lee, the Court clarified that this concerns entertainability, not maintainability.
No inherent lack of jurisdiction (para 23): Though the Single Judge noticed that writ power is to be exercised in exceptional rarity, he went into the intention of the parties and the true nature of the agreements. The Arbitrator was empowered to decide the objection, and an error on merits would not be beyond jurisdiction.
No interpretation of contract in writ (paras 24–25): The Arbitrator is still seized of the matter and evidence is yet to be led, so determining the nature of the agreements would prejudice the parties. Following Bhaven Construction, the Court declined to decide whether the agreements were a conveyance and left the question open.
Final Outcome and Directions
- The Single Judge was not justified in exercising writ jurisdiction to examine and set aside the Arbitrator's Section 16 order; the Division Bench rightly set it aside (para 26).
- The issue of stamping of the agreement dated 12.02.2004 and the subsequent agreements is kept open to be raised by the aggrieved party under Section 34, if needed (paras 25, 27).
- The Court did not deal with the decisions cited on whether the agreements amount to conveyance (para 25).
- Civil Appeal dismissed with no order as to costs; pending applications disposed of (para 27).
Legal Principle Laid Down
When a writ petition invoking both Articles 226 and 227 is decided without confining the jurisdiction to Article 227, an intra-court writ appeal lies. An arbitrator's order rejecting an objection of insufficient stamping under Section 16 is within the tribunal's jurisdiction; given Sections 5, 16(6) and 34 of the Arbitration and Conciliation Act, 1996, a High Court should entertain a writ challenge to it at the interim stage only on a higher threshold, and should not enter into the merits or interpret the contract, since non-stamping is a curable defect that can be tested in a challenge to the award (paras 14, 21–24).
Precedents Relied Upon
- In Re: Interplay Between Arbitration Agreements under the Arbitration and Conciliation Act, 1996 and the Indian Stamp Act, 1899, 2023 INSC 1066 (Constitution Bench) – Relied upon – stamping objections fall within the ambit of the Arbitral Tribunal; non-stamping is a curable defect. Discussed at paras 20–23.
- M/s S.B.P. and Company v. M/s Patel Engineering Ltd., 2005 INSC 526 (Constitution Bench) – Relied upon – orders of the arbitral tribunal not open to correction under Articles 226 or 227 during arbitration. Discussed at para 18.
- M/s Deep Industries Ltd. v. Oil and Natural Gas Corporation Limited, 2019 INSC 1299 – Relied upon – challenge to dismissal of a Section 16 application must await the award. Discussed at para 19.
- Bhaven Construction v. Executive Engineer, Sardar Sarovar Narmada Nigam Limited, 2021 INSC 9 – Relied upon – Arbitration Act a code in itself; interpretation of contracts not generally undertaken in writ jurisdiction. Discussed at paras 19, 24.
- Lokmat Newspapers Pvt. Ltd. v. Shankar Prasad, 1999 INSC 279 – Relied upon – petition under both Articles 226 and 227 and maintainability of Letters Patent appeal. Discussed at paras 13–14.
- Umaji Keshao Meshram v. Radhikabai, 1986 INSC 41 – Relied upon – such petition to be treated as under Article 226 so as not to deprive the right of appeal. Discussed at para 13.
- Sh Jogendrasinhji Vijaysinghji v. State of Gujarat, 2015 INSC 485 – Relied upon – maintainability of a letters patent appeal depends on pleadings and the nature of the order. Discussed at para 14.
- M/s Godrej Sara Lee Ltd. v. Excise and Taxation Officer-cum-Assessing Authority, 2023 INSC 92 – Relied upon – entertainability and maintainability are distinct. Discussed at para 22.
Important Paragraphs of the Judgment
Verbatim extracts from the judgment. For the full text, refer to the judgment PDF below.
Para 14: "Moreover, the mine owner himself having invoked both Articles and having succeeded before the learned Single Judge, in fairness, he ought not now contend that the writ petition preferred by him was only under Article 227 of the Constitution so as to question the maintainability of the writ appeal."
Para 21: "The remedy of having the Tribunal satisfy itself on the question of stamping under Section 16, with the award remaining open to challenge under Section 34 at a later stage, is not inadequate."
Para 22: "In other words, the threshold to be satisfied before exercising discretion under Articles 226 and 227 of the Constitution in the light of such legislative intent would be higher."
Para 23: "The jurisdiction to decide cannot mean to decide in a particular manner. While exercising such power, one may err on merits. Such error may not be one beyond jurisdiction."
Para 23: "Assuming that the learned Arbitrator erred in his conclusion that the agreement between the parties was ‘an agreement to sell’, that would not make the case ‘exceptional’ for being set aside in exercise of writ jurisdiction."
Para 24: "An exercise requiring interpretation of the various agreements ought not to have been undertaken in exercise of extraordinary jurisdiction."
Practical Impact of the Ruling
- For parties to arbitration: A rejected stamping objection under Section 16 should ordinarily be carried to a Section 34 challenge after the award, not to a writ court mid-arbitration (paras 21–22, 27).
- For High Courts: Even where a writ petition is maintainable, the statutory scheme of minimal interference raises the bar for entertaining it, and courts should not interpret the contract at that stage (paras 22–24).
- For litigants filing composite writ petitions: A party that invokes both Articles 226 and 227 and succeeds cannot later argue that only Article 227 was invoked to defeat an intra-court appeal (para 14).
- For stamp duty disputes: Whether an agreement is a conveyance or an agreement to sell is a merits question for the tribunal on evidence; the Supreme Court has expressly left it open in this case (para 25).
- For arbitration practitioners: The ruling applies Re: Interplay to treat stamping as a curable defect within the tribunal's competence, not a ground of inherent lack of jurisdiction (paras 21, 23).
FAQs on Writ Challenge to Section 16 Stamping Orders
1. What did the Supreme Court decide in Tarini Prasad Mohanty v. Sunflag Iron and Steel?
It dismissed the mine owner's appeal and upheld the Orissa High Court Division Bench, holding that the Single Judge should not have set aside the Arbitrator's Section 16 order on stamping in writ jurisdiction (paras 26–27).
2. Can an arbitrator's order rejecting a stamping objection be challenged in a writ petition?
A writ petition may be maintainable, but given Sections 5 and 34 of the A and C Act, a higher threshold applies; it must be shown that the challenge cannot await the award and that interim intervention is imperative (para 22).
3. Does insufficient stamping take away the arbitrator's jurisdiction?
No. Relying on Re: Interplay, the Court held that non-stamping or inadequate stamping is a curable defect and stamping objections fall within the ambit of the Arbitral Tribunal (paras 21, 23).
4. Was a writ appeal maintainable against the Single Judge's order?
Yes. The writ petition invoked both Articles 226 and 227, and the Single Judge did not confine himself to Article 227, so the writ appeal was maintainable (paras 13–14).
5. Were the iron ore agreements held to be a conveyance?
The Court did not decide this. It left open whether the agreements were a conveyance or agreements for sale, to be raised under Section 34 if needed (paras 25, 27).
Keywords: 2026 INSC 566, Tarini Prasad Mohanty v. Sunflag Iron and Steel, Section 16 Arbitration Act, Section 34 Arbitration Act, insufficient stamping, impounding, Indian Stamp Act, conveyance, agreement to sell, Article 226, Article 227, writ appeal maintainability, entertainability, Re Interplay, Deep Industries, Bhaven Construction, minimal judicial intervention, Justice Atul S. Chandurkar, Justice J.K. Maheshwari, Supreme Court reportable judgment
Related on LegalTaxGuru
Download Judgment PDF – Tarini Prasad Mohanty v. Sunflag Iron and Steel
Source: Supreme Court of India (official website).